Installation of a cooling system for the food industry.
Last year, we successfully installed a sophisticated cooling system with a usable total chain length of almost one kilometer and a throughput time of approx. 90 minutes for a cheese dairy. Despite challenging conditions, we were able to complete the project on time and to the customer's satisfaction. The result: an efficient and reliable cooling system that optimizes cheese production!
Our system was also featured on Galileo! Watch the video


